HOT|COOL NO. 5/2026 "DH - FROM VISION TO INFRASTRUCTURE"

A lesson for other district heating companies For utilities considering lower temperatures, the key message from Albertslund is to broaden the objective. Do not treat the project solely as an exercise in reducing a temperature setpoint. Use it as an opportunity to examine the network's operational architecture. Begin with the consumers and the data. Find the buildings and hydraulic conditions that define the present limit. Choose a zone where learning is possible, install the necessary monitoring, and agree in advance how success will be measured. Include heat loss, return temperature, and pumping energy, but also track interruptions, time spent locating faults, the number of consumers affected by maintenance, and the operator's ability to restore normal conditions. Then scale in stages. The right solution may include local shunts, boosters, new valves, building-level improvements, or changes in control strategy. The exact combination will vary, but the principle remains: solve local needs locally where this avoids imposing unnecessarily high conditions on the whole network. Most importantly, involve operations from the beginning. The people who run the network know where pressure is fragile, where consumer complaints arise, and which interventions are difficult. Their knowledge is essential to designing zones that work outside the hydraulic model. Low-temperature DH is therefore not only about efficiency or future heat sources. When combined with deliberate zoning and strong operational practice, it can create a network that is easier to adapt, more precise to operate and more resilient when conditions change. That is the inspiration Albertslund can offer internationally: the temperature transition can also be an operational transformation.

Distribution alone is not enough, however. Each local station introduces equipment that must be inspected, maintained, and understood. Utilities should consider backup power, safe fallback modes, remote communication, spare parts, and access during emergencies. They should also test scenarios rather than assume the system will respond as intended. What happens if a pump stops? Which valves should be operated? How quickly will pressure fall? Which consumers must be prioritised? Resilience is created through both physical design and rehearsed operational practice. Lessons from international dialogue Albertslund has hosted many visitors from utilities, municipalities and energy organisations outside Denmark. Their questions reveal that the international relevance is not limited to a particular Danish temperature level. Visitors commonly want to know how an existing system can be changed while remaining in service, how customer installations are brought into the process, how operators learn to manage several local units, and how the business case can include reliability and avoided disruption as well as reduced heat loss. One recurring experience from these visits is that the technology is usually easier to explain than the transition process. A shunt station, pump, or control valve can be shown in a diagram. The more difficult part is coordinating network data, building improvements, investment planning, communication, and operational training over several years. The visits also underline that no universal blueprint exists. Dense urban networks, smaller towns, different building standards, and different heat sources require different zone sizes and temperature paths. What can be transferred is the method: identify local constraints, create measurable zones, reduce temperatures in controlled steps, and use operational feedback to decide the next move. International guests often bring different regulatory and climatic conditions, but the core management challenge is recognisable: progress must be ambitious enough to support decarbonisation and cautious enough to preserve customer trust. More flexibility, but not less responsibility A zoned low-temperature network is not automatically simpler to operate. It may be more demanding because operators must understand how pumps, valves, controls, pressure, and local units interact. More measurement points generate more information, but also require data quality, alarm management, and clear responsibility. The gain is not that every task becomes easier. The gain is that the utility has more options. The network can be controlled more precisely, disturbances can be contained, and maintenance can be organised around smaller operational units. To realise those benefits, utilities need competent staff, documented procedures, and a culture in which operating experience feeds back into planning and design.

For further information please contact: Pernille Salomonsen, ppg@albertslund.dk

13 www.dbdh.dk

Powered by