DIGITALISATION OF THE DANISH DISTRICT HEATING SECTOR

CASE CATALOGUE 2023

“THERE ARE HUGE FINANCIAL BENEFITS FROM MERGING A HEAT­ ING PLANT AND WATERWORKS. BOTH DURING THE CONSTRUCTION PHASE AND AFTER THE PLANT IS OPERATIONAL. REMEMBER TO DISCUSS EXPECTATIONS WITH THE SYSTEM SUPPLIER. AND MAKE SURE TO KEEP YOUR METER-READING SYSTEM SIMPLE.”

PALLE PEDERSEN, OPERATIONS MANAGER, AN ENERGI A.M.B.A

Solution Much of the hassle and expense of reading meters manually is related to accessing the property. The board therefore decided the time had come for a change, as the majority of batteries in existing heat meters were worn out. The board wanted processes to be technologically up to date after such an investment. They therefore settled on the manufacturer’s best two-flow heat meter, which made it possible also to monitor for any leakages in individual households. Results Aalestrup has now been using the new system for a while and is very happy with it. There is a huge potential in ex- ploiting the ability to read meters remotely, and there are constant new developments. As purchasing licences is relatively expensive, and as it requires many working hours to get the most out of the systems, not all options are currently relevant.

• Guidance on cooling, consumption, etc. has been made considerably easier since actual values can now be read. It is very helpful to be able to provide documented data, especially when consumers think their supply tempera- ture is too low. Alarm notifications from both water and heat meters in the event of water losses or water penetration are available. The alarm notifications are particularly helpful for water meters. Damaged heating installations seem to be rarer. The two flows have not quite met expectations, especially because only alarm notifications are recorded and not the associated flow on both flow meters. This can cause difficulty identify- ing the cause of the alarms. When Nørarger needs to repair main pipes, the company exploits their ability to identify the maximum consumption level, especially at large consumers/companies, where rules of thumb are less exact.

Nørarger corrects supply temperatures manually based on temperature measurements at consumer households.

AN Energi a.m.b.a Digitalisation of Water and Heating Consumption Data CASE 9

However, some of the benefits, achievable by most, are:

Budgetary follow up and accrual calculations have become much easier and less time consuming.

• Annual meter readings completed in just a few hours. Only a few meters need to be read manually, and this is done from a handheld terminal in the service vehicle. All readings from the plant and consumers are therefore done simultaneously, minimising administrative costs. • Readings when customers move house are also carried out on the precise date. • Consumers can keep track of their consumption and temperature levels daily on the company's website. • They can make graphs to assist in fault finding, particu- larly if they have purchased additional meters to log consumption at single-minute intervals.

There are also a large number of smaller fires that can be put out; fires that Nørarger had not predicted. This also means that, although cost reductions may not have been achieved, it has become possible to provide far better customer ser- vice using the same resources, and unnecessary call-outs have also been reduced.

Challenge In 2014, Aalestrup Varme and Aalestrup Vand entered into a contract with Kamstrup on a three-year project to replace all energy meters. Subsequently, the Aalestrup and AN Energi heating plants merged, and a similar system was quickly established at AN Energi in the northern part of Jutland, Denmark. The heating plant already had a ‘drive-by’ solution, and the waterworks used meters that remotely read data from con- sumers once a year.

We decided to ask local plumbing companies for estimates for meter replacement. The plumber was to change both the water and heat meter when he was at the house. The heating plant would also cover the cost of a quick service inspection by the plumber of the consumer’s installation. The plumbing company had three years to complete the project, which could be carried out when the company had free slots in its schedule.

INFORMATION

Meters Address Email Phone

Company Solution Providers Employees Heat

4.000 (both heath and water) Elmegaardsvej 6, 9620 Aalestrup, Denmark info@an-energi.dk +45 98 64 13 55

AN Energi a.m.b.a Kamstrup 6 54 GWh

The project could therefore be completed at a relatively low cost.